Structural Verification – Pile Cage Platform NEOM Saudi Arabia
Project Overview
GeoStruXer served as the Third-Party Designer for Al Oasis Contracting Co., conducting a detailed structural analysis and verification of a steel platform proposed for pile cage-making operations in Neom, Saudi Arabia. This project exemplified the importance of rigorous engineering checks to ensure the safety, performance, and stability of industrial platforms under real-world operational conditions. The scope of work focused exclusively on the superstructure of the platform, providing precise column reactions for the foundation design to be executed by the client. Our analysis adhered to stringent industry standards, including ASCE 7–16 for load and response factors and AISC 360–2016 for the design of steel structures, ensuring compliance with international safety and performance benchmarks.
Challenges
Load Complexity
Connection Analysis
Tight Timeline
Solution Approach
3D Structural Modelling
Used advanced 3D analysis tools to simulate platform behavior under specified loads, ensuring accurate evaluation of members and connections.
Standards-Based Evaluation
Analyzed per ASCE 7–16 and AISC 360–2016 standards, covering load combinations, deflections, and stresses.
Connection Verification
Validated the structural integrity of bolted and welded connections under operational conditions.
Optimized Load Distribution
Provided precise column reactions for efficient foundation design and reliable load transfer.
Value Engineering & Sustainability
Safety
Ensured the design met all safety and stability criteria.
Reliability
Delivered a robust design for long-term operational load–bearing.
Efficiency
Minimized material use and costs without over design.
Collaboration
GeoStruXer worked closely with Al Oasis Contracting Co., maintaining transparent communication and providing timely updates and documentation to meet the client’s needs.